<nobr id="ocezt"><cite id="ocezt"></cite></nobr>
    <bdo id="ocezt"></bdo>

      色综合久久中文字幕有码_日本一级婬片人妻_老少熟妇视频A片视频_免费网址日本大片无码专区观看素人_久章草在线毛片视频播放

      Chaosheng bathroom teaches you the installation precautions of shower!
      • Date:2023-02-25
      • Read:2491
      1. The distance between the cold and hot water outlets is 13-15 / cm and parallel and vertical. The constant temperature shower requires that the water outlet must be hot on the left and cold on the right. The water outlet shall not be concave into the ceramic tile surface for more than 0.5cm.
      2. Drain the water for 15 seconds and clean the sediment and impurities in the pipeline to avoid blocking the valve core.
      3. When installing the main body, pay attention to check whether there is 6 sealing water gasket. Cushion cloth must be used when fixing the nut to prevent scratching the surface
      Prev

      What are the general types of faucet materials?

      Next

      Purchasing skills of fabricated bathroom

      色综合久久中文字幕有码
      <nobr id="ocezt"><cite id="ocezt"></cite></nobr>
        <bdo id="ocezt"></bdo>